I'm So Excited- Again

For several reasons:

1) Although I told you "enough already" about the bathroom, I get to use the shower today. The grout is fully cured. So that's REALLY the end of the bathroom news. (Fair warning-- there will be another bathroom renovation, but I'm pretty sure it won't be as exciting for me. At least I don't think I can afford for it to be....)

2) This arrived in the mail yesterday. It's my copy of The Book for which I authored The Chapter that I whined about so mightily a few months back. I'm Chapter 15- Capillary Blood Sampling. Aside from the fact that I am now published (in hard cover, I might add- with internal spiral binding for your reading convenience), I won't ask you to get excited about it. A bunch of my friends at work also contributed. If you're not "in the business" this book is definitely not your cup of tea. It's not only extremely esoteric, it's also a bit graphic. But as far as professional "how-to" guides go, it's pretty darn swell. It'll be something to show my grandchildren, which I hope I don't have any of very soon.


3) I was able to move some shifts next weekend, so I can go to Blacksburg to help sew together the Hokie Healing blankets. This project has helped me a lot, and helping put them together is something that I really, really wanted to do. And I was pretty devastated when I realized I was scheduled to work for the entire weekend. Some of my co-workers made switches with me-- one even working my Saturday in exchange for her Wednesday!!! I still need to work next Friday, so I'll either leave after work (7:30 p.m.) or more likely, get up around 4 a.m. and arrive around 9, in time to hit Starbucks before going to The Inn for the Great Sewing Together of the Hokie Healing Blankets.

4) I got a call at 5:15 this morning asking if I'd like to be off work today. Since I'm bumping up against my maximum number of vacation hours, it took about 3-1/2 seconds to say "You Betcha!!" I may be able to spend a bit of time at Knit Happens today. And if not today, maybe sometime over the weekend. I haven't been in for awhile because of my schedule, and I miss those chicks with sticks.

And now I think I'll go back to bed for an hour or so.

Tuesday, June 05, 2007

Enough Already!

...about the bathroom.

OK, but first, some final detail pics. The Nurse had a REALLY good time at Bed Bath & Beyond yesterday-- found some antiqued pewter accessories on sale- (including a wastebasket!), a really nice shower curtain bar, a travertine candle base and some nice rocks, and a cinnamon and frankincense candle.


And since there's really not a proper linen closet, I found this little shelf unit for the new towels.

I do believe I've shared more than I ever thought I would about my bathroom.

Enough Already!

Sunday, June 03, 2007

Ta-Dah!!!!

Now, before you say "Isn't this supposed to be a knitting blog??? And she keeps writing about her bathroom???"

Let's review a few blogging things and their similarities to the bathroom project: We love to brag about FO's. I finally have one. It still needs to be blocked (translation: the grout needs to cure until Thursday before we can use the shower).

I have the obligatory shot in the bathroom mirror picture:



And I'm showing you the details of the project:











And we sometimes talk about our storage options:








Finally, the view from the throne:





Details: We contracted through FH FURR. They are a large, reputable plumbing company in Northern Virginia. We have used them for heating and air conditioning service for many years. We were initially referred to FH FURR by a doctor I worked with who highly recommended them when we'd been through the mill with several other firms trying to handle a pesky furnace.

We decided that, although we love do-it-yourself projects and we've done small bathroom do-overs in the past, we didn't have the time, energy or expertise to take on this type of project. And we really didn't have the time, energy or resources to have someone else re-do it if we screwed it up. We wanted it done right and done fast.

Planning took a couple of weeks-- meeting with the representative to discuss options and fixtures (don't you just love the antique pewter faucets and shower head and handle?), selecting tile at Mosaic Tile showroom in Lorton. Once this was done, we received our final estimate and the project was scheduled to begin within 2 weeks. The Husband and I purchased the vanity, medicine cabinet, storage cabinet and sink from Lowe's. The sink was special order, and although the delivery time was 3 weeks, we lucked out and had it in a week and a half.

Actual work in the bathroom from start to finish was 1-1/2 weeks--6 actual days of work with 4 days of the Memorial Day Weekend in the middle. The company sent us a schedule and they stuck to it. Work included: demolition & removal of old bathroom fixtures, re-plumbing & shower bed preparation (2 days);
tiling & grouting (3 days);
plumbing finish and fixture installation (1 day).

The products we chose are beautiful. The workmanship is excellent. All the workers were courteous, cleaned up after the project, and kept the noise as low as could be expected, considering the amount of sawing, pounding, hammering etc required. The time involved couldn't be beat.

Would I recommend them? Yes. Unequivocally.

The Bottom Line:
One caveat if you're on a tight budget-- make sure you understand what your costs are during the design phase. Let the company representative know what your limit is, ask questions, and make sure you understand everything he's telling you. They want your business, and they have a vested interest in making sure you're happy. They can explain what you absolutely need, and what you can get for the amount of money you're able to invest in the project. If you have some flexibility, they can also help you to understand where you can tighten up the project, and where you can splurge a bit. Of course, the labor costs will always be there.

We knew what we were getting into, and decided to go pretty big on this, enjoy the project, and not stress about what we knew would be a pretty good chunk of change. This is a capital improvement to our home. We did compromise on some aspects that saved us several thousand dollars, but still resulted in what we consider to be a spectacular little space.

When doing a project like this there are a couple of ways you can go-- you can figure "the hell with it, we're going to get everything we can dream of" which can be very dangerous. Fancy shower features can add several hundred to thousands of dollars. It took my breath away. Extra tile features can add hundreds more. These hundreds here and there add up, and knowing where to draw the line is very important. At the same time, there can be the tendency to nickel-dime the project. It's going to cost thousands, and saving $10 or even $50 on something may not be in your best interest if you won't be happy with the finished product.

We could have reduced our costs in several ways- some would result in substantial savings-- thousands, and some in more moderate savings: We could tile only the floor and shower area and paint the rest of the walls (thousands), select a less expensive tile (more thousands-ours was pretty high-end) and eliminate the little stone shelves, go less high-end on the towel bar and tp holder (several hundred), use different sink material, use different plumbing fixtures, etc. For the time being, we're forgoing the glass sliders on the shower, which will cost $1500-2000, because we have another bathroom project coming up. We'll put in a tension bar and get a really nice shower curtain. And we may decide that we like that just fine.

You get what you pay for. We got a lot. And it was money well spent.

Thursday, May 31, 2007

Almost Finished!!!

The Great American Bathroom Remodel, that is...

It's not the ultimate bathroom of my dreams, let me make that clear. The UBMD would be at least 4 times this size with a very large tub having a wide tile surround that I could put plants and candles on, and a separate shower with a rain head, and two sinks and mood lighting, heated towel bars, and hell, while I'm at it, a small refrigerator that would hold a couple of bottles of champagne. (And somebody to keep the place clean would be nice, too.)

But what we have is a 5' X 8' space that needed re-plumbing, modernizing, minimal maintenance while being beautiful and functional. We weren't willing to do structural house changes, and enlarging the bathroom would have cost us what little closet space we have and/or the other bathroom-- neither being an option.

I'm happy so far, and I trust I'll be when it's finished out tomorrow.

I'm really pleased with the tile. It's a bit pricey, and we chose to tile the entire room. It feels like being in a canyon-- very organic, cool (I hope I don't regret that in the winter), and peaceful.

We're completely grouted, and the fixtures and plumbing fit-out get installed tomorrow. We are eventually planning on a glass slider for the shower, but for now we'll use a tension bar and heavy-gauge shower curtain.

Check it out (and click on the pics to enlarge-- the detail of the tile guys is pretty neat-- never thought I'd be so inspired by a "good grouting"):

The Shower- check out the little tiles on the shower floor.


The little stone shelves at each end of the shower-- and the polished stone accents at eye level (eye level for tall people, that is.)


The stone and antiqued brass towel bar and stone tp holder. (The blue tape is not a design feature-- it's just to keep the towel bar in place until the cement and grout cure.)

The grout needs to set for a week, and then we can use the shower.

Think I'll treat myself to some new towels.

Wednesday, May 23, 2007

Tomorrow (Today) It Begins

The Great American Bathroom Rehab, that is.

Here are the "before" pictures. The Husband has already removed the blue tile, the white and blue flowered wallpaper, and knocked out a bit of the wall around the plumbing:

Note the snazzy floor tile. The crew is arriving at 8 am to gut the room, remove the tub, toilet, vanity, and flooring, replace the wallboard in what will be the shower area, and get ready for tiling next week.

This is going to be fun...

It IS going to be fun...

Right?

In Knitting Knews,
A Hokie Bird Hokie Square, with his friends the Mitred Squares and Mr. Diagonal Stripe.

He needs to be blocked, and he doesn't have his detail stitching around the beak and waddle area, but that'll be done soon.

And I need some instant gratification, so I'm starting on a boxy summer cardigan from bulky summer stash yarn. Here's the first bit: